Customer :

BP

Role :

Main Contractor

Key date :

2018-2020

Location :

Frontignan - FRANCE, Europe

Description of the Project

Installation of a new White Product Offloading Terminal in the harbour of Sète.

Work done and added value of our solution

Geocean’s scope of work

Onshore pipeline:

  • precommissioning

Offshore pipeline:

  • 1.352 km of 24″ pipe (3LPP+CWC)
  • Debris removal
  • Precommissioning

HV Cable / FOC

  • Procurement
  • Offshore Installation

Back to the references Back to our map references