Customer :
YPF
Role :
Reservoir Engineering, Technical Assistance
Key date :
Commissioning 2001
Location :
Diadema, Argentina, Argentina
Description of the Project
120 Million m3 working gas capacity in a depleted gas field located in Diadema (Chubut, Argentina).
- 10 injection/production wells
- Total gas capacity 400 Million m3
- Max. injection rate: 1.25-106 Nm3 /day
- Max. withdrawal rate: 1.25-106 Nm3 /day
- Commissioning and start up in 2001
Work done and added value of our solution
- Assistance to conversion to UGS facility, Feasibility and Subsurface Basic Design studies
- Seismic interpretation
- Petrophysical analysis
- Construction and history-matching of a 3D reservoir model
- Reservoir follow-up and technical assistance to storage operation
- Capacity extension studies using the 3D model
- Assistance to operation