Customer :

JTC Corporation

Role :

Engineering & Storage operator

Key date :

Commissioning 2013

Location :

Jurong, Singapore, Singapore

Description of the Project

1.5 Mm3 Liquid Hydrocarbons (Naphtha – Condensates – Crude Oil)  in Mined Caverns under the Bayan Basin (Jurong Island) – Singapore

Work done and added value of our solution

Phase 1 : 5 caverns – 2 in operation

  • Assistant to owner for caverns creation with JCPL (Jurong Consultants P.L)
  • Feasibility study
  • Business model & Market study
  • Basic engineering design – D&B contractor selection
  • Construction supervision and subsurface Equipment
  • Storage Operation

Phase 2 : 5 caverns in projet

  • Engineering studies

Storage Operation:

  • Banyan Caverns Storage Services (Ownership structure: VTS:45% – Geostock 35% – JCPL 20%)
  • Storage operation : 2014-2029 (15 years)

Scope of work:

  • BCSS : General Management/Operation & Maintenance/HSE Management
  • Geostock: Specialized & general assistance / Geoscience engineer on site

Back to the references Return to Geostock reference map

Cavité Jurong_Singapour

  • Liquid Hydrocarbons
  • Mined Rock Cavern