Customer :

REPSOL

Role :

Main Contractor

Key date :

2017 - 2019

Location :

La Pampilla - Lima - PERU, Latin America

Description of the Project

Installation of a fourth import and export terminal of refined products through an SPM system.

Work done and added value of our solution

  • The design, procurement and installation of two 18 inches pipelines, about 4,200 m long each, from onshore to the buoy
  • The supply and installation of one Electrical Power Cable from onshore to the buoy (WD 20m)
  • The supply and installation of one Fiber Optic Cable from onshore to the buoy, and subsea seastate conditions monitoring system (ADCP).
  • The supply and installation of an underwater junction box which allow the Fiber Optic future connections to other existing terminals
  • The design and installation of the cathodic protection by impressed current
  • The installation of the SPM system, including turret buoy, anchors and chains, PLEM, Hoses and Umbilicals risers.

GEOCEAN YAGANA Barge specification